Phase transitions

PhaseEnteredReviewed/approved byNotes
requirements-definition2026-08-25with the PRbugfix.md — root cause confirmed from the graph + hooks source
design2026-08-25with the PRlock-at-the-gate; lock-artifacts hook
test-planning2026-08-25with the PRmatrix: unit, graph integration, e2e
tasks-breakdown2026-08-25n/a — no gatefive tasks, all complete
implementation2026-08-25hook + both graphs + skills/commands
verification2026-08-25full suite, lint, types, markdown
needs-review2026-08-25pendingPR opened for human review

Pull requests

PRScope / tasksStatus
the-loop PR for claude/github-issue-281-1nrn5o (T1–T5)whole work itemopen

Progress entries

2026-08-25 — implemented lock-at-the-gate end to end

  • Phase: implementation → verification
  • Did: added the lock-artifacts hook (front-matter splice, fail-closed verification, approver recording); dropped locked: true from every producing node in pdlc-work-item-loop and pdlc-contribution-loop; wired the hook into requirements-approval, design-approval and plan-approval; removed session-owned approval steps from the skill, the workflow reference and six commands; re-based the e2e suite on draft fixtures so the gates' locking is what the happy path proves.
  • Checkpoint/tests: uv run pytest (full suite) pass; ruff check + ruff format --check pass; pyright pass. See evidence/test-run.md.
  • Next: PR review.
  • Blockers: none.

Verification results

This work item has a testing-plan.md; results are recorded there (docs/specs/issue-281/testing-plan.md § Verification results). This section intentionally holds only that pointer.

Design critic review

Not selected for this work item (single-session cloud walk; the design is reviewed with the PR).

RoundCritic (<harness>/<model>)OutcomeFindings → dispositionLink
not selectedn/an/a

Review cycles

CycleType (self/critic/security)ReviewerOutcomeLink
1selfsessionnew findings — two stale tests asserted the pre-fix contract (test_graph_model, test_graph_verification_integration); updated to the gate-owned lockthis PR
2selfsessionnew findings — create-testing-plan.md step 1 demanded a locked design before its gate (self-contradiction predating this fix); reworded to "complete, still draft"this PR
3selfsessionzero (converged) — full suite green, docs sweep found no remaining pre-gate approval languagethis PR

Security review (gate)

  • Mechanism: the-loop checklist (security.review.mechanism: auto, no security-review skill in this session)
  • Outcome: pass — lock-artifacts consumes only the same-chain classify-feedback verdict (authorized, non-self-authored authors only), so who can approve is unchanged; the write is a local spec-directory splice, verified after writing and failing closed; handles are quote-stripped before being spliced into YAML so no handle can alter front-matter syntax. Removing locked: from producing nodes removes no human decision: every artifact that had a gate keeps it.
  • Human sign-off: n/a (tier 3 < security.review.humanSignOffMinTier: 4)

Final validation evidence

Acceptance criteria → proof, summarised from testing-plan.md:

  • AC 1.1 (producing nodes gate shape only): test_graph_model / test_graph_verification_integration assert locked absent and a draft plan passing; e2e fixtures are drafts and every producing node passes.
  • AC 1.2 (the gate locks and records the approver): test_an_approval_locks_the_artifact_and_records_the_approver, and the e2e happy path's lockedBeforeImplementation — draft fixtures reach implementation as status: approved.
  • AC 1.3 (changes-requested never locks): test_changes_requested_leaves_the_artifact_unlocked, plus the review-rejection scenario looping design back and converging.
  • AC 1.4 (absent artifact = planned absence): test_an_absent_artifact_is_a_planned_absence_not_a_block.
  • AC 1.5 (regression walk): the reworked happy-path scenario — unlocked fixtures, one approval per gate, locked at implementation — fails on the pre-fix graph (a draft artifact blocked its producing node) and passes now.
  • AC 2.1 (tasks-breakdown needs no human): happy path advances tasks-breakdown → implementation with no approval comment in between, and tasks.md is deliberately absent from lockedBeforeImplementation.
  • AC 2.2 / 2.3 (skills stop re-implementing approvals): SKILL.md, reference/workflow.md, and the brainstorm, new-requirement, create-design, create-testing-plan, create-tasks-plan, work-on, contribute-to commands no longer instruct a session to request or block on an approval, or to set status: approved.

Raw run output: evidence/test-run.md.

Capability docs

Capability docWhat changedHistory row
docs/capabilities/process-graph.mdlock-artifacts added to the shipped-hook vocabulary with its contract; test-planning/human-gate sections updated to the gate-owned lockissue-281 row added
docs/capabilities/spec-workflow.mdThe iterate-until-locked rule became the gate-owned lock; brainstorm/testing-plan bullets updatedissue-281 row added

Documentation

DocumentWhat changed
README.mdArtifact-chain paragraph: the gate locks on the human's one approval; gate-less artifacts advance on shape
docs/guide/what-is-the-loop.mdSame rework of the chain description, the opt-in critic ("completed design"), and the designer loop
skills/the-loop/SKILL.md + reference/workflow.md, reference/design-artifacts.md, reference/collaboration.mdApprovals owned by approval nodes; sessions never lock or re-request
commands/* (brainstorm, new-requirement, create-design, create-testing-plan, create-tasks-plan, work-on, contribute-to)Pre-gate approval steps removed; gate-less phases proceed on shape

Released under the MIT License.