Design: test and verification as nodes in the PDLC

Phase 2. Derives from the locked requirements.md. D1/D2 revised on PR #166 at the owner's request: test-planning moved before design-approval so one human gate approves the design and the testing plan together.

Overview

Two nodes, one new artifact, no new runtime code paths.

mermaid
flowchart LR
  RD[requirements-definition] --> RA{{requirements-approval}}
  RA --> D[design]
  D --> TPN[["test-planning<br/>produces testing-plan.md"]]
  TPN --> DA
  DA --> TB[tasks-breakdown]
  TB --> IMPL[implementation]
  IMPL --> V[["verification<br/>re-gates testing-plan.md"]]
  V --> SR[self-review]
  SR --> CR[critic-review] --> SEC[security-review] --> EV[evidence]
  EV --> CD[capability-docs] --> RB[reviewer-briefing] --> HA{{human-approval}} --> C[complete]

  style TPN fill:#e8f4ff,stroke:#3b82f6
  style V fill:#e8f4ff,stroke:#3b82f6

testing-plan.md is authored at test-planning and completed at verification — one artifact with two gates, exactly the shape tasks.md already has (tasks-breakdown writes it, implementation re-gates it with checkmarks: complete). That symmetry is the whole design: it needs no new hook, no new resolver, and it inherits the produce-then-re-gate semantics the runtime, the parity tests and the-loop check already implement.

Architecture

D1 — test-planning sits between design and design-approval

The plan is derived from what must be true (requirements) and how it is built (design), and tasks.md is derived from all three: each task's _Test:_ names a matrix row (R1.3). Putting planning after the task DAG would invert that — the plan would be reverse-engineered from the tasks it is supposed to constrain.

Revised on PR #166 (owner's call): the node originally sat after design-approval. It now sits before it, so the single human gate approves design.md and the plan together — see D2.

design.md's Testing strategy section stays and keeps its gate; its role narrows to the strategy in a paragraph (how requirements map to test levels, which contracts are involved), while testing-plan.md owns the executable detail. The alternative — folding the plan into design.md — was rejected: the artifact has a second life at verification, and an artifact that is edited after implementation cannot also be a design artifact locked before it.

D2 — no approval node of its own; the design-approval gate covers the plan

Revised on PR #166. The original call was "no human gate at all" — the plan would be locked like every artifact and reviewed on the PR. The owner asked whether the plan could instead be produced with design.md so the design gate covers both, and that is the better answer: the plan is significant enough to want an explicit human approval, but not significant enough to earn a sixth stop.

So test-planning is ordered before design-approval, and the gate now:

  • reviews two artifacts, design.md and the testing-plan.md derived from it;
  • records feedback into both (record-feedback is declared twice, once per artifact) — a reviewer's note about the test matrix belongs in the plan, not filed under the design, and travelling-with-the-document is the whole point of the hook;
  • routes changes-requested back to design, not to test-planning, so a changed design re-derives the plan on the way back through. The plan can never be approved against a design that moved under it.

The alternative the owner literally proposed — folding the artifact into the design node (produces: [design.md, testing-plan.md], no test-planning node) — reaches the same gate but loses what D4 argues for: the node is what gives the plan a phase, a loop:test-planning label, and a validate-artifacts call whose sections: list is about that artifact. One node producing two artifacts has one sections list for both, so a missing Test matrix and a missing Architecture are indistinguishable in the block message.

D3 — verification re-gates testing-plan.md, it does not mint a report

A separate verification-report.md would need its own template, its own manifest entry and its own parity coverage, and would immediately duplicate two things that already exist: the plan (which says what should run) and the execution log's Final validation evidence (which the later evidence node gates). Re-gating the plan keeps plan and result in one diff — a reviewer reads one file and sees intent beside outcome.

Division of labour with the existing evidence node: verification produces the raw record (per-activity command, outcome, evidence link); evidence summarises it against the acceptance criteria in the execution log (R3.4). evidence stops re-deriving what verification already established.

D4 — the two nodes carry phases

Both nodes declare a phase:, so both appear as loop: labels and in the execution log's front matter. The post-implementation nodes that share the needs-review label do so because they are review rounds on the same state; a work item in test-planning or in verification is in a materially different state from one in design or in needs-review, and the ticket should say so. This is also what makes them nodes in the PDLC in the sense the ticket asks for, rather than hidden sub-steps.

Cost: two new repository labels (loop:test-planning, loop:verification) that /the-loop:init creates and /the-loop:upgrade-the-loop reconciles.

D5 — the type matrix is a documented catalogue, not a schema enum

The candidate testing types (R2.1) live in the bundled template and in reference/testing.md, not in harness-config.schema.json. An enum would have to be exhaustive to be useful and would make adding "chaos testing" a schema migration; the matrix is prose an agent fills in, and the gate checks that the section exists and is non-empty, not that a particular row is present. n/a + reason (R2.2) is a convention the template teaches and the reviewer enforces — the same footing as "no new attack surface is written and justified", which has held since issue-47.

D6 — the environment is declared, never managed

Verification environment is a section of markdown: repositories, services, fixtures, credentials-by-reference, and the commands. the-loop runs the commands the project already has; it adds no runner (R5.3). Where an operator has written this down, the plan links the registered customInstructions doc instead of copying it — the loop already reads those docs at the start of a work item (reference/instructions.md), so the planning stage has them in hand.

Components & interfaces

ComponentChangeContract
cli/the_loop/graph/pdlc.yaml+2 nodes, edges rerouted, design-approval records feedback into both artifactsdesign → test-planning → design-approval → tasks-breakdown; implementation → verification → self-review
skills/the-loop/templates/testing-plan.mdnewMust satisfy both nodes' required sections (P3)
.the-loop/manifest.yaml+2 entriestesting-plan.md @ test-planning; evidence/ optional directory
.the-loop/harness-config.schema.jsonphases enum/default; stage defaultsP4 parity
.the-loop/harness-config.yaml, templates/harness-config.yamlphases; stagesP4 parity
skills/the-loop/templates/{design,tasks,execution-log}.mdpointers, phase list, transitions rowprose only
SKILL.md, reference/{workflow,testing}.mdrender the new sequenceprose only
commands/create-testing-plan.md, commands/verify-work.mdnew slash commandsmatch the nodes' command:
commands/{work-on,create-design,create-tasks-plan,execute-tasks}.mdchain the new stepsprose only
docs/capabilities/*, docs/reports/labels-and-dashboards.md, guide/READMErenderprose only

Node declarations

yaml
# ordered between `design` and `design-approval`, so one human gate covers both
- id: test-planning
  phase: test-planning
  actor: agent
  produces: [testing-plan.md]
  command: create-testing-plan
  stage: test-planning
  entry: [set-phase-label, log-entry]
  exit:
    - {hook: validate-artifacts, with: {locked: true, sections: [
        "Test matrix", "Verification environment", "Evidence plan", "Verification results"]}}
    - lint-artifacts

- id: verification
  phase: verification
  actor: agent
  produces: [testing-plan.md]
  command: verify-work
  stage: verification
  entry: [set-phase-label, log-entry]
  exit:
    - {hook: validate-artifacts, with: {checkmarks: complete, sections: ["Verification results"]}}
    - verify-tests

Two details are deliberate:

  • test-planning gates on Verification results too. The section must exist from the moment the plan is authored (holding "not yet executed"), because validate-artifacts treats an empty required section as a finding. Authoring the heading up front means verification fills a section rather than inventing one, and a reader of the locked plan can see the shape of the record it will become.
  • verification re-declares produces. validate-artifacts returns skipped when a node declares no artifacts — which is why a node cannot gate on sections it does not produce. Declaring the artifact is what makes this gate actually run, rather than reporting success without running (the issue-124 failure mode).

verify-tests on the verification node is the same no-op-unless-declared hook the implementation node already carries: with no command param it records skipped. It is listed so that a future graph revision (or a user-authored graph, once those land) has the obvious place to bind a project's verification command.

Data models

testing-plan.md front matter mirrors every other spec artifact (type, phase, workItem, status, approvedBy, overrides), with phase: test-planning — P3 requires the declared phase to be one of the producing nodes' phases, and test-planning is where it is authored.

Body sections (the gated four in bold):

SectionWritten atPurpose
Test matrixtest-planningone row per testing type: applies / n/a + reason, scope, where it runs
Scenarios & requirement tracetest-planningmatrix rows → requirement ids → Gherkin Scenario: titles
Verification environmenttest-planningrepos, services, fixtures, credentials by reference, bring-up commands
Evidence plantest-planningwhat will be captured per activity, and where under evidence/
Verification activitiestest-planning → ticked at verificationthe checklist the checkmarks: complete gate reads
Verification resultsplaceholder at test-planning, filled at verificationper activity: command, outcome, evidence link
Review commentshuman gatesrecord-feedback

Evidence lives under <specDir>/<id>/evidence/. The manifest tracks it as a directory pattern, which the parity tests deliberately exclude from the artifact contract (a pathPattern ending in / is not a gated file) — the same treatment docs/specs/<id>/design/ already gets.

Error handling

SituationBehaviour
testing-plan.md absent at test-planningvalidate-artifacts blocks, naming the missing file (existing message)
plan not lockedblocks: status: draft, expected status: approved
a gated section missing or emptyblocks per section — this is why the results heading is authored up front
an activity left unticked at verificationblocks: n task(s) still unticked — R3.3's fail-closed
an activity that genuinely cannot runnot ticked; the reason goes in Verification results and the matrix is edited (with the reason) or the item escalates
environment bring-up failsrecorded, activities unexecuted, escalate (R5.4) — the gate stays closed
in-flight item with no planblocks at test-planning; write the plan or use the audited the-loop graph force

Security design

Enforces the boundaries the requirements raised.

  • AuthN/AuthZ: unchanged. No node here calls a remote API, and neither new node is a human gate, so no approval authority moves.

  • Input validation & injection surfaces: the only inputs are files inside the repository's own spec folder, read through the existing frontmatter/validate-artifacts path. No new parser, no new ingress. The abuse case worth naming is the reverse direction: a testing plan names commands an agent will run, so the plan is executable content and reviewed as code — the rule reviews.critics[] already carries (decision-043), restated in reference/testing.md and in the template's own guidance. the-loop never executes a command from an unreviewed plan: the plan is a committed file that arrives through PR review.

  • Secrets handling: two rules, both stated in the template where the author will read them and enforced at review:

    1. Verification environment names credentials by reference (env var name, secret-store key) and never by value.
    2. Evidence is repository content — public if the repo is. Redact tokens, cookies, personal data and internal hostnames from captured output and screenshots before committing; if a capture cannot be redacted, it is not committed and the results row says so. A secret that reaches a commit is rotated, not merely edited out.
  • Least privilege: unchanged; verification runs the project's own commands with the permissions the session already has. The plan is where an operator can see, before approving, what those commands are.

  • Fail-closed behaviour: every failure mode in the table above blocks the node. The new nodes add no bypass; security-review remains required: true, and verification sits before the review chain precisely so a failed verification is visible to the reviewers rather than discovered after them.

  • Abuse-case coverage:

    Abuse case (requirements)MechanismProving test
    secret/PII committed as evidenceredaction rule in the template + reviewreviewed, not automated (out of scope)
    literal credential in the planby-reference rule in the template + reviewreviewed
    plan smuggles a commandplan is reviewed as executable content on the PRreviewed
    a new node weakens a gategraph structuretest_the_verification_gate_is_not_a_skip, test_the_shipped_graph_splits_the_needs_review_label, P1–P4 parity

Testing strategy

The change is declarative, so the tests are structural — and the structural tests that already exist do most of the work, which is the point of adding nodes to a graph that is already held to its manifest, its templates and its configs:

  • P1–P3 (test_graph_parity.py) cover the new artifact for free: the manifest must track testing-plan.md at test-planning, the graph must accept it, and the bundled template must satisfy every gated section of both producing nodes.
  • P4 covers the two new phases against both harness configs, in graph order.
  • New unit coverage in cli/tests/test_graph_model.py: both nodes exist, carry phases, sit on the expected edges, and — the regression this design specifically guards — the verification gate is not a silent skip (it declares produces).
  • New integration coverage in cli/tests/test_graph_verification_integration.py, with Gherkin docstrings per testing.gherkinDocstrings: required, driving the real hooks over a temporary spec folder: an unticked activity blocks, an empty results section blocks, a complete plan passes.

Its own testing plan is testing-plan.md — this work item dogfoods the artifact it introduces.

Trade-offs & decisions

DecisionAlternative rejectedWhy
D1 plan before tasksafter taskstasks reference matrix rows; the plan must exist first
D2 no approval nodea sixth human gatetasks-breakdown precedent; PR review already covers it
D3 re-gate the planverification-report.mdone artifact, one diff, no new template/manifest/parity surface
D4 real phases + labelsreuse needs-reviewa node the ticket cannot show is not a node in the PDLC
D5 catalogue in the templateenum in the schemaadding a testing type must not be a schema migration
D6 declare the environmentown a runnerR5.3 — the-loop facilitates verification, it does not own it

Durable record: decision-060.

Open questions

None outstanding; the three from requirements are resolved as D1–D3.

Review comments

Appended by the-loop's record-feedback hook when a human gate approves with comments (issue-109).

Released under the MIT License.